This job shows the standard we bring to every site — clean, compliant, and on schedule
Project gallery

Key Areas
Stormwater:
New PVC stormwater lines laid in open trenches to the correct fall, joined to new pits, then backfilled.
Courtyard:
A grated strip drain along the house and new pits under the pavers, so surface water drains away instead of pooling against the walls.
Inspection:
A drain camera run before and after the work to find the problem, check the new lines and confirm everything flows freely.
Details
Pipe and Fittings
PVC stormwater pipe and fittings, bedded and supported along the trench to keep the fall consistent.
Pits and Grates
Inspection pits with removable grates, so the lines can be checked and cleared in future.
Testing
Every new line flushed and checked with a drain camera before the trenches were closed.
Reinstatement
Trenches backfilled and compacted, and the courtyard paving and garden beds put back as we found them.